Total Productive Maintenance (TPM) & OEE Optimization Consultancy

Achieve zero breakdowns, zero accidents, zero defects, and maximize Overall Equipment Effectiveness (OEE).

Total Productive Maintenance & Overall Equipment Effectiveness (OEE)

Total Productive Maintenance (TPM) Consulting & Machine Reliability Advisory

A comprehensive manufacturing excellence framework focused on machine health and operator ownership. We implement the 8 Pillars of TPM, with special focus on Autonomous Maintenance (Jishu Hozen), Planned Maintenance, and Overall Equipment Effectiveness (OEE) tracking.

Unplanned machine breakdowns halt production schedules, cause expensive late-delivery penalties, damage tooling, and frustrate shop-floor morale. Total Productive Maintenance (TPM) is the world-renowned Japanese methodology that transforms maintenance from reactive firefighting into proactive equipment partnership between operators and maintenance technicians. Proceva guides your facility through the 8 core pillars of TPM—spearheaded by Autonomous Maintenance (Jishu Hozen) and Planned Maintenance—to eliminate the Six Big Losses and elevate plant Overall Equipment Effectiveness (OEE) beyond 85%.

Key Technical Focus Areas & Clauses:

Overall Equipment Effectiveness - OEE (Availability x Performance x Quality)

Quantifying and tracking the 6 Big Losses: equipment breakdowns, setup/adjustment time, idling/minor stops, reduced speed, process defects, and startup yields.

Autonomous Maintenance (Jishu Hozen)

Step-by-step operator training: initial machine cleaning, eliminating contamination sources, establishing cleaning & lubrication standards, and general inspection.

Planned Maintenance Pillar

Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR) tracking, spare parts inventory control, and predictive maintenance schedules.

Focused Improvement (Kobetsu Kaizen)

Cross-functional engineering projects targeting chronic equipment stoppages and long changeover times (SMED).

Measurable Commercial & Operational Benefits:

  • Measurable improvement in machine availability, operating performance, and Overall Equipment Effectiveness (OEE)
  • Drastic reduction in unplanned machine breakdowns and emergency maintenance overtime
  • Operator empowerment through autonomous daily cleaning, lubrication, and inspection (CLI)
  • Standardized preventive maintenance calendars and predictive vibration/thermal monitoring
Target Applicability

Who Requires TPM (Total Productive Maintenance)?

Capital-intensive production plants, continuous process industries, stamping presses, molding lines, CNC machine shops, and packaging lines.

Estimated Implementation Timeline:
8 to 16 weeks to Audit Readiness

Customized based on your operational complexity, headcount, and target audit date.

Operating Since 2018 • ISO 17021 Advisory Independence

Operating since 2018, Proceva Consultancy provides independent implementation advisory, diagnostic gap analysis, lean SOP design, and pre-audit simulations. Independent accredited third-party certification bodies conduct formal audits and issue certificates, eliminating any conflict of interest.

Decision-Maker Assessment Guide

Evaluating TPM (Total Productive Maintenance) for Your Organization

Before investing capital and team hours into implementation, use this structured framework to clarify strategic need, baseline preparation, and what auditors will actually evaluate.

Strategic Triggers for TPM (Total Productive Maintenance):

Organizations typically commission Proceva advisory for TPM under one or more of these four commercial situations:

1. Enterprise & OEM Vendor Qualification:

Major corporate procurement panels, Tier-1 system assemblers, or public sector tenders mandate TPM (Total Productive Maintenance) as a non-negotiable gateway for RFQ registration and vendor code allotment.

2. Export Trade & Cross-Border Customs Clearance:

International buyers in Europe, the Americas, or the Middle East require accredited conformity proof to verify quality, safety, or regulatory compatibility.

3. Operational Predictability & Rework Reduction:

Leadership seeks to eliminate daily operational chaos, establish clear process accountability across shifts, and stop repeating the same costly customer defects.

4. Statutory & Regulatory Mandate:

Compliance with central ministries, pollution boards, food authorities, or Quality Control Orders (QCOs) mandates a certified management or product conformity system.

Pragmatic Advisory Advice

When Should You NOT Pursue This Standard?

If your leadership team only seeks a piece of paper to hang on the wall without allowing supervisors to log actual production data, certification will collapse during annual surveillance.

Proceva only partners with organizations that want genuine operational discipline and audit-proof documentation.

Mandatory Governance & Engineering Artifacts

Essential Technical Deliverables for TPM (Total Productive Maintenance)

To withstand rigorous third-party registrar scrutiny, our consultancy builds and validates these core technical artifacts directly within your operations.

8-Pillar Framework

8 Pillars of TPM Strategic Architecture & Master Roadmap

Comprehensive governance manual covering Autonomous Maintenance, Planned Maintenance, Quality Maintenance, Focused Improvement, Early Equipment Management, Education & Training, Safety/Health/Environment, and Office TPM.

OEE Tracking

Overall Equipment Effectiveness (OEE) Tracking Architecture

Mathematical formulation and computerized shift dashboards calculating Availability x Performance x Quality, tracking the 6 Big Losses and minor stoppage root causes.

Jishu Hozen SOPs

Autonomous Maintenance (Jishu Hozen) 7-Step Step-Up Manual

Step-by-step operator coaching protocol: initial deep cleaning (cleaning as inspection), source-of-contamination elimination, cleaning & lubrication standards, and general inspection routines.

Planned Maintenance

Planned Maintenance MTBF & MTTR Diagnostic Ledger

Equipment history cards, Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR) analytics, critical spare parts min/max inventory registers, and lubrication schedules.

CBM Diagnostics

Predictive Condition-Based Monitoring (CBM) Protocol

Standard operating procedures for periodic vibration analysis, infrared thermography on electrical panels, and oil spectrographic analysis on heavy gearboxes and hydraulic presses.

Strategic Context: Total Productive Maintenance (TPM) vs Reactive Maintenance vs RCM

Reactive maintenance fixes equipment only after it breaks down ('firefighting'). Reliability Centered Maintenance (RCM) uses advanced engineering models to predict component lifespans. TPM goes beyond both by creating a plant-wide cultural partnership between operators and maintenance technicians, eliminating the root causes of wear before breakdowns occur through daily pride in equipment ownership.

Audit Risk Mitigation

Common Stage 2 Audit Pitfalls & How Proceva Pre-Empts Them

Most external audit failures happen because of superficial paperwork that crumbles under registrar interrogation. Here is how our advisory closes real failure points before auditors arrive.

Common Mistake #1

Rushing operators into machine maintenance without structured Jishu Hozen training.

Auditor Consequence:Operators use incorrect grease grades or over-lubricate bearings, inducing catastrophic motor burnout and mechanical failure.
Proceva Pre-Audit Solution:

We install color-coded lubrication point tags and train operators through visual One-Point Lessons (OPLs) before handover.

Common Mistake #2

Manipulating OEE formulas by excluding lunch breaks or scheduled changeovers from total available time.

Auditor Consequence:Artificially inflated OEE scores (e.g. reporting 85% when true factory productivity is under 55%), blinding management to real capacity losses.
Proceva Pre-Audit Solution:

We enforce strict international OEE calculation standards based on total planned calendar production hours.

Common Mistake #3

Treating maintenance as purely a technical department function with zero operator ownership.

Auditor Consequence:Persistent 'I run it, you fix it' shop-floor mindset leading to chronic operator neglect and unaddressed minor alarms.
Proceva Pre-Audit Solution:

We institute autonomous maintenance step-up certifications celebrating operators who restore their machines to like-new condition.

Verification Methodology

Accredited Certification Checkpoints for TPM

A clear, transparent breakdown of what accredited certification body auditors examine during Stage 1 desk review versus Stage 2 on-site evaluation.

Audit Milestone 01

Stage 1 Audit Milestone: Baseline OEE & Machine Criticality Assessment

Primary Scrutiny: Establishing true equipment baseline availability, MTBF/MTTR history, machine criticality ranking (A/B/C classification), and pilot cell selection.

  • Completion of 30-day baseline OEE shift logs separating breakdown hours from changeover losses
  • Equipment criticality ranking classifying high-impact bottleneck assets as Class A
  • Initial deep clean on pilot asset with physical yellow-tagging of air/oil leaks and loose wiring
  • Compilation of One-Point Lessons (OPLs) covering operator machine safety and daily lubrication points
Audit Milestone 02

Stage 2 Audit Milestone: Jishu Hozen Step 3 Audit & Breakdown Elimination

Primary Scrutiny: Formal cross-functional audit verifying operator cleaning/lubrication standards, reduction in unplanned breakdowns, and verified OEE improvement.

  • Verification that 100% of initial yellow tags on pilot machines have been resolved by maintenance
  • Auditing operators executing live shift cleaning, lubrication, and inspection routines under 10 minutes
  • Documented reduction in minor stops (< 5 minutes) and measurable upward trend in pilot cell OEE
  • Audit of spare parts warehouse verifying critical spares availability and zero stockouts for Class A machinery
Structured Advisory Blueprint

The Complete Certification & Compliance Journey

Certification should never feel like an unpredictable gamble. We break the entire implementation and audit journey into 8 transparent milestones with distinct roles, tangible artifacts, and zero surprises.

01Milestone Duration: Week 1

Stage 01: Understand & Boundary Scoping

Define scope, applicable standards, product exclusions, and physical facility boundaries.

Clear Division of Responsibilities (Ethical ISO 17021 Alignment):
01
Your Organization's Scope:

Appoint organizational point-of-contact, provide process maps, headcount, and shift details.

02
Proceva Advisory Scope:

Review products, statutory permits, customer expectations, and formulate the fixed-manday implementation charter.

03
Accredited Registrar (CB) Scope:

No active involvement yet (maintains strict ISO 17021 independence).

Tangible Deliverables & Records Created in Stage 01:
  • Scope Boundary & Standard Applicability Dossier
  • Clause Justification Matrix (including permissible exclusions like Clause 8.3 Design)
  • Fixed Milestone Calendar & Single-Point-of-Contact (SPOC) Assignment
Audit Risk Pre-Empted:

Prevents discovering in the final audit that critical production lines or outsourced processes were mistakenly omitted from the certificate scope.

ISO 17021 Compliant • Ethical Advisory
Phased Execution

TPM Equipment Reliability Roadmap

Transforming operator machine ownership and eliminating unplanned breakdown downtime.

01Condition Audit

Baseline Equipment Condition Audit & Pilot Line OEE Calculation

Auditing breakdown histories, calculating baseline Overall Equipment Effectiveness (Availability × Performance × Quality), and selecting a pilot model machine.

02Jishu Hozen Step 1

Autonomous Maintenance: Initial Deep Cleaning & Tagging

Operators and technicians conduct joint deep-cleaning of pilot machines, uncovering hidden micro-defects, loose bolts, and oil leaks, applying red/white identification tags.

03Contamination Containment

Elimination of Contamination Sources & Hard-to-Access Points (SOC/HTA)

Fabricating splash guards, installing quick-open inspection acrylic windows, and redesigning grease nipples to slash operator inspection and cleaning time.

04SOPs & Standards

Tentative Cleaning, Lubrication & Tightening (CLT) Standards

Authoring visual step-by-step standards indicating exact grease points, lubricant grades, tightening torques, and inspection frequencies for operators.

05Reliability Metrics

Predictive Maintenance Integration, MTBF/MTTR Tracking & OEE Rollout

Implementing vibration analysis and thermography for critical drives, tracking Mean Time Between Failures (MTBF) and Mean Time to Repair (MTTR), and rolling out TPM plant-wide.

Commercial & Operational Confidence

Addressing Real Concerns Before You Engage Us

Clear, transparent answers to the questions quality heads and business owners frequently ask before commissioning advisory work.

?

What is an ideal Overall Equipment Effectiveness (OEE) target for manufacturing?

World-class OEE is considered 85% or higher (typically comprising 90% Availability, 95% Performance rate, and 99% Quality rate). Many manufacturing plants operate between 50% and 65% OEE before TPM implementation, offering immense capacity unlock without buying new machines.

?

How do we overcome operator resistance to cleaning and inspecting their own machines?

Operators often view maintenance as someone else's job. Proceva conducts interactive shop-floor workshops demonstrating how minor dust and loose bolts cause catastrophic breakdown jams that force stressful overtime, teaching them that cleaning is an act of inspection.

?

What are the Six Big Losses targeted by TPM?

Availability Losses: 1. Equipment failure/breakdowns, 2. Setup and adjustment downtime; Performance Losses: 3. Idling and minor stops, 4. Reduced operating speed; Quality Losses: 5. Process defects and scrap, 6. Reduced yield during startup.

Internal Competence & Auditor Qualification

TPM Autonomous Maintenance (Jishu Hozen) & OEE Optimization Workshop

2-Day Practical Shop-Floor Workshop • Target: Maintenance Heads, Plant Engineers, Production Supervisors & Machine Shift Operators

Explore Course Details
Technical & Commercial Queries

Frequently Asked Questions on TPM

Direct answers from senior lead auditors regarding compliance scopes, documentation requirements, and auditor expectations.

What is considered a world-class OEE benchmark?

Worldwide, an OEE score of 85% is considered world-class for discrete manufacturing (composed of 90% Availability, 95% Performance, and 99.9% Quality). Most unmanaged factories run between 45% and 60% OEE. Proceva helps you accurately measure your baseline and systematically close the gap.

How does Autonomous Maintenance differ from regular maintenance?

In traditional factories, operators only run the machine ('I operate, you fix'). Under TPM Autonomous Maintenance (Jishu Hozen), machine operators take daily pride in cleaning, inspecting, and lubricating their equipment, detecting anomalies before they cause a catastrophic breakdown.

Regional & National Delivery Footprint

How We Deliver TPM Advisory Across Regions

Whether you require responsive on-site lead auditors on your shop floor in Ahmedabad, statewide industrial advisory across Gujarat, or proven hybrid implementation nationwide, Proceva delivers structured, zero-bureaucracy compliance support.

Head Office • 24–48 Hr Response

Ahmedabad & Local GIDC Hubs

Vatva, Naroda, Sanand, Changodar, Odhav, Kathwada & Maninagar

Direct in-person plant deployment from our Maninagar office. We conduct physical shop-floor walk-throughs, inspect gauge calibrations and machine maintenance logs, and provide bilingual workforce coaching in Gujarati and Hindi.

Rapid 24-hr on-site gap assessment
Bilingual shop-floor operator training
Sanand & Vatva vendor audit alignment
Statewide GIDC Coverage

Gujarat Industrial Corridors

Vadodara, Ankleshwar, Bharuch, Surat, Rajkot, Morbi & Vapi

Active advisory across Gujarat's manufacturing heartland. We align procedures with GPCB statutory environmental consents, support Gujarat DIC / MSME-ZED subsidy documentation, and engineer OEM core-tool dossiers.

GPCB consent & Form 10 integration
Assistance with Gujarat DIC MSME subsidies
Heavy engineering & chemical belt readiness
Pan-India Hybrid Framework

Pan-India Advisory & Tenders

Mumbai, Pune, Bengaluru, NCR, Chennai, Hyderabad & Multi-Site

Digitally enabled collaborative drafting combined with rigorous on-site lead auditor pre-audit simulations. Fully compliant with GeM portal mandates, PSU tender criteria, and accredited Certification Body standards.

GeM portal & PSU tender pre-qualification
Cloud-based digital SOP authoring & review
Stage 1 & 2 audit simulation & query closure
Flexible Advisory Scopes

Engagement Options for TPM

Every facility operates at a different stage of operational maturity. Select the exact scope of advisory work that aligns with your timeline, budget, and internal team bandwidth.

Most Selected • Full Turnkey

Turnkey Implementation

Zero to Stage 2 Clearance
Best Suited For:

First-time standard adoption, newly commissioned plants, or companies completely overhauling a legacy, non-functional quality system.

What We Deliver:
Clause-by-clause diagnostic gap analysis & milestone roadmap
Tailored, lean SOPs, quality manual & statutory risk registers
Departmental process coaching & routine shop-floor adoption
Internal audit simulation, MRM facilitation & CAPA closure
Stage 1 & Stage 2 certification body audit handholding
Typical Timeline
8 to 16 weeks
Select Scope

Diagnostic Gap Analysis

Independent Readiness Baseline
Best Suited For:

Management teams and plant heads needing an objective audit of compliance gaps and budget requirements before launching full implementation.

What We Deliver:
Complete clause benchmark against current plant practices
Red-Amber-Green compliance maturity matrix & NC inventory
Statutory and regulatory non-compliance exposure report
Actionable resource allocation and internal task blueprint
Executive presentation to managing directors and board
Typical Timeline
5 to 10 Business Days
Select Scope

Lean SOP Drafting

Workforce-Friendly Procedures
Best Suited For:

Facilities burdened by 200-page generic manuals that shop-floor operators ignore and external auditors cite for procedural deviation.

What We Deliver:
Visual, 1-page Standard Operating Procedures (SOPs)
Digital check-sheets, logbooks & inspection test plans
Role-based responsibility RACI matrices for process heads
Elimination of redundant bureaucracy and duplicated records
Document control registers with zero compliance overhead
Typical Timeline
3 to 6 Weeks
Select Scope

Pre-Audit Simulation

Stage 2 Readiness & NC Defense
Best Suited For:

Companies facing an impending Stage 2 certification audit, annual surveillance audit, or critical buyer assessment requiring urgent validation.

What We Deliver:
Unannounced mock audit simulating real registrar scrutiny
Evidence dossier audit (calibration, training, vendor files)
8D / 5-Why root cause analysis for identified vulnerabilities
Management Review Meeting (MRM) minutes & agenda closure
Audit day response strategy & auditor inquiry coaching
Typical Timeline
1 to 3 Weeks
Select Scope

Internal Auditor & Workforce Training

ISO 19011 Certified Practitioner Competence
Best Suited For:

Building a self-sustaining internal team that can independently plan, execute, and document internal audits without perpetual reliance on third-party consultants.

Interactive 2-day workshop on clause intent and audit mechanics
Practical auditing drills: evidence collection & sampling techniques
Mock audit non-conformance writing & corrective action drafting
Written competency examination & internal auditor certificates
Workforce awareness modules for line workers & supervisors
Customized plant-specific internal audit checklists and templates
Typical Timeline
2 to 5 Days (Plant Workshop)
Consultancy Delivery Footprint

Delivering Total Productive Maintenance (TPM) & OEE Optimization Locally & Nationally

Whether you operate a single manufacturing facility in an Ahmedabad GIDC, multi-site plants across Gujarat, or corporate teams across India, our advisory model matches your operational logistics.

Explore All Delivery Hubs
24–48 Hr Site Visit

Ahmedabad & GIDC Estates

Vatva, Naroda, Sanand, Changodar, Odhav, Kathwada & Chhatral

Direct physical deployment from our Maninagar registered office. Senior consultants conduct on-site factory walk-throughs, inspect calibration test benches, and deliver bilingual operator training in Gujarati, Hindi, and English.

Statewide Gujarat Scope

Gujarat Industrial Corridors

Vadodara, Ankleshwar, Bharuch, Surat, Rajkot, Morbi & Vapi

Regular on-site consulting rounds across Gujarat manufacturing clusters. We support statutory GPCB environmental consent registers, DIC MSME subsidy documentation, and automotive Tier-1 supplier quality qualification.

Pan-India Hybrid

Pan-India Implementation

Mumbai, Pune, Bengaluru, NCR, Chennai, Hyderabad & Nationwide

Cost-effective hybrid consulting framework combining cloud-based documentation with on-site lead auditor pre-audit simulation and Stage 1 & 2 audit accompaniment. Zero unnecessary travel expense bloat.

Transparent Post-Enquiry Protocol

What Happens When You Submit An Enquiry?

We respect your confidentiality and operational schedule. From your first message to on-site project kickoff, here is our strict professional protocol.

01Within 4 Hours

Senior Discovery & Mutual NDA

A Senior Consultant (never a telemarketer) reviews your scope, signs a bilateral Non-Disclosure Agreement (NDA), and conducts a 20-minute scoping call to map headcount, processes, and target timelines.

NDA & Scoping Checklist
02Within 24 Hours

Fixed-Scope Milestone Proposal

You receive an itemized proposal specifying exact consulting mandays, on-site visit frequencies, clause deliverables, and a transparent, all-inclusive fixed investment fee with zero surprise travel surcharges.

Transparent Fixed-Fee Scope
03Week 1

Designated Lead Consultant

A sector-specialized Lead Consultant is deployed with direct executive access. We conduct the on-site diagnostic walk-through and calibrate the milestone implementation charter with department heads.

Dedicated Single Point of Contact
04Stage 2 Audit

Pre-Audit Simulation & CAPA Closure Support

We simulate the certification audit before external registrars arrive. If any minor observations occur during Stage 2, our team assists in drafting root-cause CAPAs at zero additional advisory cost until all audit observations are resolved and closed.

Dedicated CAPA Support
Confidential Assessment • Senior Auditor Review

Request a Diagnostic Consultation

Quick 30-second inquiry — receive a pragmatic gap analysis roadmap and timeline clarity within 2 working days.

Tap to select
Strict NDA confidentiality • Zero spamBy requesting consultation, you agree to our Privacy Policy & Terms
Need an immediate answer? Call +91 97266 72952